MCS Certified
Microgeneration Certification Scheme
NAPIT Approved
Electrical Competency
RECC Member
Consumer Protection
ISO 45001
Health & Safety Management
ISO 9001
Quality Management
ISO 14001
Environmental Management
4.9 / 5
500+ verified reviews
Commercial Solar Panels & Battery Storage in Great Dunmow
MCS certified commercial solar installation for businesses in Great Dunmow. We cover all postcodes — CM6 — with free site surveys, detailed savings proposals, and full project management from design to grid connection.
3–5yr
Typical payback
25yr
Panel warranty
100%
AIA tax relief
The Commercial Landscape in Great Dunmow
Great Dunmow is a historic market town in the Uttlesford district of Essex, sitting directly on the A120 corridor roughly midway between Bishop's Stortford and Braintree and around five miles east of London Stansted Airport. That position gives its commercial base an unusually good logistics footprint for a town of its size: the A120 links east to Braintree, the A12 and Colchester, and west to the M11 and Stansted, while Freeport Braintree lies about 10 miles away and Chelmsford roughly 12 miles south. The result is a working economy that mixes light industrial, trade-counter, distribution and professional-services occupiers alongside a substantial arable-farming hinterland that still anchors the wider CM6 rural economy.
The town's principal commercial cluster is the Chelmsford Road Industrial Estate on the eastern side of Chelmsford Road (the B1008), a mix of light-industrial units, trade counters and distribution warehousing with occupiers including the Taylors Jaguar Land Rover approved service centre (CM6 1HD) and a Travis Perkins builders' merchant (CM6 1XG); a Travelodge sits nearby just off Chelmsford Road by the filling station. To the town's other flank, the Ongar Road Trading Estate (CM6 1EU) benefits from quick A120 access and its proximity to Stansted, while the Station Road (Station Yard) Industrial Estate off the B1008 — a development of light-industrial units and a former office building now occupied by Domino's (CM6 1XD) — and the Oak Industrial Park on Chelmsford Road (CM6 1XN) add further small-unit stock. These estates are dominated by pitched-roof and shallow-pitch steel-portal-frame industrial units — exactly the large, unshaded, structurally capable roof planes that suit commercial rooftop solar.
Beyond the estates, Great Dunmow's growth is being driven by major planned expansion: the Easton Park garden community between the town and Stansted has been allocated in the Uttlesford local plan for up to 10,000 new homes together with employment land, which will bring a fresh generation of new-build commercial roofs into the wider area over the coming years. Great Dunmow Town Council sits beneath Uttlesford District Council for planning and economic matters, and the district council is the local planning authority for commercial development across CM6.
The town's medieval core is a designated Conservation Area containing over 170 listed buildings — including the Grade I-listed Church of St Mary the Virgin and the timber-framed Clock House around the High Street, Market Place and Doctors Pond — so any renewable installation on the historic High Street frontages needs a heritage-sensitive approach. The bulk of Great Dunmow's genuine commercial roof stock, however, sits on the modern industrial estates well outside the Conservation Area boundary, where solar arrays fall almost entirely under permitted development.
Postcodes Covered
Services in Great Dunmow
Why Businesses in Great Dunmow Choose Solar
Great Dunmow sits in the East of England solar belt, receiving roughly 1,250-1,320 kWh/m² of annual irradiance — among the highest in the UK — which lets a well-oriented commercial rooftop array on a Chelmsford Road or Ongar Road unit deliver a strong, predictable yield across the year. With commercial electricity typically running at around 22-27p/kWh, an industrial or trade occupier drawing daytime load for machinery, refrigeration, EV charging or warehouse lighting can offset a large share of consumption at source and reach payback within three to six years, with 100% Annual Investment Allowance tax relief (on up to £1M of qualifying plant) sharpening the first-year cash position.
The distribution network operator across Great Dunmow and the whole CM6 area is UK Power Networks (UKPN), and most commercial rooftop systems connect under G98 (smaller) or G99 (larger) engineering recommendations. Uttlesford District Council declared a climate emergency in July 2019 and has pledged to make the district net zero by 2030, backing it with a Climate Crisis Strategy 2021-30, a £1M climate fund and the Zero Carbon Communities Grant — so on-site generation and battery storage on Great Dunmow's commercial estates align directly with local net-zero policy as well as the balance sheet.
1,300+
kWh/m²
Annual Irradiance
3–5
Years
Typical Payback
100%
AIA eligible
Tax Relief
25–30
Year warranty
Panel Life
Battery Storage & EV Charging in Great Dunmow
Most Great Dunmow businesses save 20–30% with solar alone. Add battery storage and EV charging to push total savings above 50% while future-proofing your energy infrastructure.
Battery Storage in Great Dunmow
Store surplus solar generation and eliminate peak demand charges. Great Dunmow businesses save 20–40% on electricity bills through peak shaving alone.
20–40%
Bill reduction
100%
AIA relief
10yr
Warranty
EV Charging in Great Dunmow
Workplace and fleet charging powered by your solar panels. Attract staff, support fleet electrification, and earn revenue from public charging — all on your existing Great Dunmow site.
75%
OZEV grant
7–150kW
Charger range
Free
Solar power
Solar + Battery + EV as a complete package
Single contractor, one project, maximum savings. Most Great Dunmow businesses achieve 45–55% reduction in total energy costs.
Sectors We Serve in Great Dunmow
Great Dunmow's commercial demand is led by light industrial and manufacturing units, trade-counter and builders'-merchant operators (such as Travis Perkins), motor trade and vehicle service centres, distribution and warehousing served by the A120/Stansted corridor, and a strong professional-services and retail base around the historic town centre. The surrounding CM6 countryside adds a significant arable-farming and agricultural sector, meaning grain stores, farm workshops and rural enterprise units are prime candidates for high-yield roof-mounted and ground-mounted solar alongside the town's industrial-estate occupiers.
Pricing Quick Snapshot
Indicative pricing for commercial solar installations in Great Dunmow. Actual costs depend on roof type, access, and system specification.
| System Size | Annual Saving | Typical Cost |
|---|---|---|
| 50 kW | ~£9,500–£12,800/yr | £33,000–£60,000 |
| 100 kW | ~£19,000–£25,650/yr | £66,000–£110,000 |
| 250 kW | ~£47,500–£64,125/yr | £165,000–£250,000 |
Prices exclude VAT. AIA provides 100% tax relief up to £1M.
Full Commercial Solar Cost GuideLocal Case Study
Featured Great Dunmow Installation
We are documenting our latest commercial solar installation in Great Dunmow to share real-world performance data and ROI figures. Contact us to speak with a reference customer in your area.
Request a Local ReferenceFrequently Asked Questions
For a Great Dunmow business, commercial rooftop solar typically works out at roughly £700-£900 per kWp installed, so a mid-sized 50kWp array on a Chelmsford Road or Ongar Road industrial unit generally lands in the region of £35,000-£45,000 before tax relief. With 100% Annual Investment Allowance available on qualifying plant and commercial power at around 22-27p/kWh, most Great Dunmow installs pay back within three to six years. Every quote follows a free on-site survey so the figure reflects your actual roof, load profile and half-hourly usage.
For most commercial buildings on Great Dunmow's industrial estates — Chelmsford Road, Ongar Road, Station Road and Oak Industrial Park — a rooftop solar array falls under permitted development and needs no planning application. The main exception is properties within the Great Dunmow Conservation Area (the historic High Street, Market Place and Doctors Pond core, with its 170-plus listed buildings) or any listed building, where heritage constraints apply. Uttlesford District Council is the local planning authority, and we confirm the permitted-development position for your specific CM6 site as part of the survey.
The distribution network operator for Great Dunmow and the whole CM6 area is UK Power Networks (UKPN). We handle the G98 or G99 connection application to UKPN on your behalf — G98 for smaller systems and G99 for larger commercial arrays — so your Great Dunmow installation is fully compliant and correctly notified before it's energised.
A typical commercial rooftop install on a Great Dunmow industrial unit takes around one to three weeks on site, depending on system size, roof type and whether battery storage or EV charging is included. Larger arrays on the bigger Chelmsford Road or Ongar Road warehouses can run longer. We schedule around your operating hours to keep disruption to your Great Dunmow business to a minimum, and the UKPN paperwork runs in parallel.
The main financial lever for Great Dunmow businesses is the 100% Annual Investment Allowance, which lets you deduct the full cost of qualifying solar and battery plant (up to £1M) against taxable profits in year one. Exported power can also earn income through a Smart Export Guarantee tariff. Locally, Uttlesford District Council's Zero Carbon Communities Grant supports community and organisation-led carbon-reduction projects across CM6, and we help you factor the available reliefs into your payback case.
Most Great Dunmow commercial solar projects pay back within three to six years. The town's East-of-England irradiance of roughly 1,250-1,320 kWh/m², combined with commercial electricity at around 22-27p/kWh and 100% AIA tax relief, drives a strong return — particularly for daytime-load occupiers like the light-industrial, trade-counter and motor-trade businesses on the Chelmsford Road and Ongar Road estates. Adding battery storage can further improve the return by shifting cheap or self-generated power into peak periods.
Yes. Battery storage is a strong fit for Great Dunmow's industrial and trade occupiers, letting you store surplus daytime solar generation for use in the evening or during peak-rate periods, and providing resilience for sites on the A120 corridor. We size the battery to your Great Dunmow site's load profile alongside the solar array, and it connects under the same UKPN G98/G99 process.
We cover the whole CM6 area and the wider 30-mile radius from our Sawbridgeworth base, including Great Dunmow's Chelmsford Road, Ongar Road, Station Road and Oak Industrial Park estates plus surrounding villages such as Felsted, Thaxted, Little Canfield, Great Easton, Barnston, Stebbing and Flitch Green. Nearby towns we also serve include Bishop's Stortford, Stansted, Braintree, Chelmsford and Saffron Walden.
Yes — EC Eco Energy is MCS certified, and every commercial solar and battery installation we carry out in Great Dunmow is completed to MCS standards. MCS certification is the benchmark for a properly designed and installed renewable system and is required to access the Smart Export Guarantee for exported power, giving your CM6 business quality assurance and access to export income.
Quick Resources
Postcodes We Cover in Great Dunmow
We provide commercial solar installation across all Great Dunmow postcodes. Contact us to confirm coverage for your specific site.
Nearby Areas We Serve
All three services available across every location.
Get a Free Commercial Energy Survey in Great Dunmow
Our MCS certified surveyors cover all Great Dunmow postcodes — CM6. We assess your roof, calculate your savings across solar, battery storage, and EV charging, and provide a detailed proposal at no cost and with no obligation.
- Free site survey — solar, battery, and EV charging assessed together
- Detailed energy savings and ROI calculation
- MCS certified installation and workmanship guarantee
- Tax relief advice — AIA, Full Expensing, business rates exemption
- Single contractor for the complete energy package
Request Your Free Survey
Survey Request Received
We'll be in touch within 4 business hours to arrange your free site survey.
Something went wrong. Please try again or call us directly.