Skip to content
MCS
NAPIT
RECC
ISO
ISO
ISO
Stevenage MCS Certified

Commercial Solar Panels & Battery Storage in Stevenage

MCS certified commercial solar installation for businesses in Stevenage. We cover all postcodes — SG1, SG2 — with free site surveys, detailed savings proposals, and full project management from design to grid connection.

3–5yr

Typical payback

25yr

Panel warranty

100%

AIA tax relief

The Commercial Landscape in Stevenage

Stevenage is one of the largest employment centres in the East of England, and its commercial roof stock is dominated by the Gunnels Wood employment area — a sprawling industrial and R&D district bounded by Six Hills Way to the south and served by Gunnels Wood Road, immediately east of the A1(M). This single employment area accommodates around 19,000 employees across roughly 300 businesses. Gunnels Wood Road is home to three international, sector-leading occupiers on adjoining campuses: GSK, which operates a global R&D hub here (its Medicines Research Centre on Gunnels Wood Road) and is the town's single largest employer with around 2,500 staff; the missile-systems manufacturer MBDA; and Airbus Defence and Space. Alongside them sit Fujitsu, medical research charity LifeArc, Sodexo and a Costco warehouse, plus dozens of trade-counter, distribution and light-industrial units on schemes such as Gunnels Wood Park. Stevenage Borough Council has an Article 4 Direction covering 42 individual sites across Gunnels Wood to protect this employment land from residential conversion — a strong signal of how much commercial floorspace, and how much roof, is concentrated here.

The town's second industrial cluster is the Pin Green employment area to the north-east, where a further 12 sites fall under a matching Article 4 Direction. Pin Green houses smaller manufacturers, engineering firms, wholesalers and trade units — the mid-size single-storey sheds with large flat or shallow-pitch roofs that are ideal candidates for rooftop PV. Between Gunnels Wood and Pin Green, Stevenage offers a deep pipeline of warehouse, factory and out-of-town retail roofs, most built or re-clad since the town's post-war new-town expansion and structurally suited to modern solar arrays.

Stevenage sits directly on the A1(M) (junctions 7 and 8), giving occupiers fast HGV access north to the A14/Midlands and south to the M25 and London — a large part of why the town retains its logistics and distribution base. The railway station reaches London King's Cross in around 25 minutes on the fastest Great Northern and LNER services (under 30 minutes on standard services), and also serves Cambridge and Peterborough, sustaining a substantial office and professional-services presence around the town centre. That town centre is itself in the middle of a 20-year, roughly £1bn regeneration — including the SG1 scheme led by Mace and redevelopment by Reef Estates — delivering new commercial, leisure and public-realm floorspace, much of it built to current energy-performance standards where solar and battery storage make immediate commercial sense.

The town falls within Stevenage Borough Council for planning, with Hertfordshire County Council as the upper-tier authority. Most commercial rooftop solar on Stevenage's industrial estates proceeds under permitted development rights, though owners should note that the Gunnels Wood and Pin Green Article 4 Directions and any conservation-area status affect what can be done on the ground — which is why we handle the planning check as part of every survey.

Why Businesses in Stevenage Choose Solar

Stevenage and the wider East of England receive roughly 1,250-1,320 kWh/m² of solar irradiance a year — enough for a well-oriented commercial roof to generate a strong yield across a working week when demand is highest. With commercial electricity in the region typically costing 22-27p per kWh, an energy-intensive Gunnels Wood manufacturer or a Pin Green warehouse running daytime plant, refrigeration or EV chargers can offset a large share of consumption behind the meter, giving a typical payback of 3-6 years and 100% Annual Investment Allowance relief on the capital in year one (up to the £1m AIA cap). The regional Distribution Network Operator is UK Power Networks (UKPN), and connections are made under the G98 (smaller) or G99 (larger, over 3.68kW per phase) engineering recommendations; we manage the UKPN application as part of the install.

There is also a clear local policy tailwind. Stevenage Borough Council declared a climate emergency in June 2019 and has committed the town to net-zero emissions by 2030 — one of the most ambitious targets in Hertfordshire — and has already cut roughly 15% of its baseline emissions. Businesses adding on-site generation and battery storage align directly with that borough-wide decarbonisation agenda while protecting themselves against volatile grid prices.

1,300+

kWh/m²

Annual Irradiance

3–5

Years

Typical Payback

100%

AIA eligible

Tax Relief

25–30

Year warranty

Panel Life

Maximise Your Savings

Battery Storage & EV Charging in Stevenage

Most Stevenage businesses save 20–30% with solar alone. Add battery storage and EV charging to push total savings above 50% while future-proofing your energy infrastructure.

Solar + Battery + EV as a complete package

Single contractor, one project, maximum savings. Most Stevenage businesses achieve 45–55% reduction in total energy costs.

Get Package Quote

Sectors We Serve in Stevenage

Stevenage's commercial energy demand is led by advanced manufacturing, pharmaceuticals and aerospace/defence R&D — GSK, MBDA and Airbus anchor a Gunnels Wood cluster of high-consumption, high-value operations — supported by logistics and distribution using the A1(M) corridor, trade-counter and wholesale units, out-of-town retail (including Costco), light industrial and engineering firms at Pin Green, and a growing town-centre office and professional-services base built around the fast King's Cross rail link. These are precisely the daytime-load, large-roof commercial occupiers for whom rooftop solar and battery storage deliver the fastest returns.

Pricing Quick Snapshot

Indicative pricing for commercial solar installations in Stevenage. Actual costs depend on roof type, access, and system specification.

System Size Annual Saving Typical Cost
50 kW ~£9,500–£12,800/yr £33,000–£60,000
100 kW ~£19,000–£25,650/yr £66,000–£110,000
250 kW ~£47,500–£64,125/yr £165,000–£250,000

Prices exclude VAT. AIA provides 100% tax relief up to £1M.

Full Commercial Solar Cost Guide

Local Case Study

Solar inverter installation in Stevenage
Stevenage Case Study

Featured Stevenage Installation

We are documenting our latest commercial solar installation in Stevenage to share real-world performance data and ROI figures. Contact us to speak with a reference customer in your area.

Request a Local Reference

Frequently Asked Questions

There is no single figure — cost scales with roof size and load. A typical mid-size Pin Green trade or light-industrial unit might install a 30-50kW system, while larger Gunnels Wood warehouse and manufacturing roofs often support 100-250kW or more. With Stevenage commercial electricity at around 22-27p/kWh and 100% Annual Investment Allowance relief on the capital in year one, most Stevenage installs reach payback in 3-6 years. We provide a fixed written quote after a free roof survey.

Most rooftop commercial solar in Stevenage proceeds under permitted development rights and does not need a full planning application. However, the Gunnels Wood and Pin Green employment areas are covered by Article 4 Directions, and conservation-area or listed-building status can change what is allowed, so we always run a planning check with Stevenage Borough Council as part of the survey before any work starts.

The Distribution Network Operator across Stevenage and the whole East-of-England region is UK Power Networks (UKPN). Smaller systems are notified under G98 and larger commercial arrays (above 3.68kW per phase) are applied for under G99. We handle the full UKPN application and any required network study on your behalf as part of the installation.

For a typical Stevenage commercial roof, the physical installation takes from a few days to around two weeks depending on system size and any electrical upgrade work. The longer lead time is usually the UKPN G99 grid-connection approval for larger systems, which we manage in parallel so your Gunnels Wood or Pin Green site stays operational throughout.

The main financial benefit for Stevenage businesses is the 100% Annual Investment Allowance, which lets you deduct the full cost of a qualifying solar and battery system against taxable profits in the year of purchase, up to the £1m AIA cap. Combined with 3-6 year payback and the borough's net-zero-by-2030 agenda, this makes on-site generation strongly cost-effective; we outline the exact tax treatment in every quote.

Often yes. Many Stevenage sites — particularly Gunnels Wood manufacturers and Pin Green units running refrigeration, plant or EV charging — have demand that peaks at expensive times or continues after dark. A battery lets you store daytime solar generation, shift it to peak periods, and add resilience against grid-price volatility, improving overall returns beyond solar alone. We size storage to your actual half-hourly consumption.

Yes. We work across the full range of Stevenage commercial roofs, from single trade-counter units to large warehouse, distribution and manufacturing buildings of the type found along Gunnels Wood Road and Six Hills Way. We handle structural roof assessment, UKPN grid connection, and phased installation to keep operations running on active sites.

We cover the whole of Stevenage across the SG1 and SG2 postcode districts, including the Gunnels Wood and Pin Green employment areas, the town centre and out-of-town retail sites. Stevenage sits well within EC Eco Energy's 30-mile service radius from Sawbridgeworth, and we also serve neighbouring towns such as Welwyn Garden City, Hatfield, Hertford and Buntingford.

Stevenage receives roughly 1,250-1,320 kWh/m² of solar irradiance a year, typical for the East of England. A well-oriented, unshaded commercial roof will produce most of its output during working hours, when demand and grid prices are highest — which is exactly why daytime-load Stevenage businesses see the fastest payback. We model your specific roof orientation and pitch to give a firm annual generation estimate before you commit.

Postcodes We Cover in Stevenage

We provide commercial solar installation across all Stevenage postcodes. Contact us to confirm coverage for your specific site.

SG1SG2

Get a Free Commercial Energy Survey in Stevenage

Our MCS certified surveyors cover all Stevenage postcodes — SG1, SG2. We assess your roof, calculate your savings across solar, battery storage, and EV charging, and provide a detailed proposal at no cost and with no obligation.

  • Free site survey — solar, battery, and EV charging assessed together
  • Detailed energy savings and ROI calculation
  • MCS certified installation and workmanship guarantee
  • Tax relief advice — AIA, Full Expensing, business rates exemption
  • Single contractor for the complete energy package

Request Your Free Survey

No obligation. We typically respond within 4 business hours.

Call Estimate Free Quote

Before You Go...

Get your free savings estimate in 60 seconds. No commitment.

We respect your privacy. No spam, ever.

Request a Callback

Leave your details and we will call you back within 2 hours during business hours (Mon-Fri, 8am-6pm).

Prefer to call us directly? Ring 01279 295630 and speak to our team now.